Photo. Story. 5 CPU2 utility space #5

Photo. Story. 5 CPU2 utility space #5

In the picture, the brickwork of Service Room No. 5 of the SPP-2 (steel shop) is under construction (for 350). The interior interior of the room is reassembled. In the foreground, in the center, lay stacks of reinforced concrete slabs. Beside, cellophane film and bricks used in the construction of the office space. There are metallic netted constructils, fragments of stairwells. On the right, there is a brick wall, and the second floor is being built. On the ground floor, I don't know.

 

Creation time: январь 2000 y.

Share:

Comments

Add comment

Please, write something!

Image